Scope
Built at the DryMax factory, then delivered and installed 2 CDP-5000 anti-condensation units in the processing room of a seafood exporter, followed by airflow balancing and handover.
The customer's problem
Seafood processing rooms are cold and humid, so ceilings and pipes sweat; water dripping onto the line threatens food safety.
ENCO's solution
CDP-5000 units supply dry air to stop condensation in the processing room; ENCO built the units, installed each one and balanced the airflow on site.
Results
- Built and delivered in January 2026
- Two units installed in January 2026
- Airflow balanced in March 2026, handed over in April 2026