Scope
An air handling unit (AHU) built at the DryMax factory in Vietnam, crated and shipped by container to Singapore.
The customer's problem
Sea-freight equipment must be finished, tested and crated at the factory, because repairs are hard once it arrives.
ENCO's solution
Assembled and tested at the DryMax factory, crated and loaded into a container on site in May 2026.
Results
- Export container loaded in May 2026

Photos from the site









